Gaelscoil, Castletroy, Limerick

Project Summary

Heating Services Installation

Scope of Works

  • Carried out modifications to existing Boilerhouse installation as detailed on the drawings, including pressurisation unit and pump etc.
  • Supplied and installed new boiler and associated pipework, valves and connections as per drawings
  • Supplied and installed new radiators as indicated on the drawings
  • Supplied and installed new LPHW pipework (steel tube) as indicated on the drawings
  • Supplied and installed new LPHW pipework valves and fittings as per drawings
  • Pressure tested all new LPHW pipework and existing pipework as required
  • Tested and commissioned system
  • Exposed pipework was un-insulated. Pipework installed in risers/ducts was insulated

Insulation

The Insulation services installation scope of works for this project involved the following:

  • Supplied and installed pipework insulation (foil back) to new LPHW water pipework systems
  • Insulatde all new pipework in boilerhouse and all external and concealed pipework

Controls

  • Installed new controls for the new heating system and connected to existing
  • Demonstration of the system operation to the CA and client

Project Description

Client: Gaelscoil, Castletroy
Project Type: Full Mechanical Installation and Services
Contract Price: €245,000.00
Contract Duration: 6 Months
Main Contractor: Townmore Construction Ltd