EI Electronics, Shannon, Co Clare

Project Summary

Scope of works

The project concerned the refurbishment of Bays 160/161 at Shannon Industrial Estate for Ei Electronics. The mechanical services installation consisted of the following but was not limited to:

  • Mains Water Services Installation
  • Hot & Cold Water Services Installation
  • Ventilation Installation
  • Fume Extraction Installation
  • Compressed Air Installation
  • Air Conditioning Installation
  • Fire Extinguisher Installation
  • Soils and Waste Pipework Installations and Floor Gullies
  • Controls Installation
  • Sterilisation, Cleaning & Flushing
  • Commissioning and Testing

Also included in the works was the decommissioning, isolation, draining, blanking off and safe removal and disposal of existing mechanical services included in the existing Bays 160 and 161.

Project Description

Client: EI Electronics
Project Type: Full Mechanical Services Installation and Services
Contract Price: €34,000.00
Contract Duration: 3 Months
Main Contractor: Nautic Builders